beverage Case Studies

Worldwide Beverage Co. upgrades Hot Fill Thermal Processor

When a global beverage leader wanted to upgrade a hot fill thermal processor in one of their western US facilities, they turned to TriCore to replace the controls in accordance with corporate standards, corporate quality requirements, and to help reduce product thermal abuse. To this end, TriCore implemented a new SCADA system and upgraded their PLC. A data collection and reporting system was engineered to provide processing and sanitation reporting. The project scope consisted of electrical design; panel fabrication; functional specification; software engineering for PLC and HMI equipment; data collection and reporting; site installation and commissioning.